Institute for Research on Economics and Society – Faculty of Economics and Business – University of Indonesia

Unlocking Renewable Energy Potential in Indonesia: Assessment on Project Viability

Abstract

Indonesian Government has set an ambitious target to achieve 23 percent of renewable energy share in primary energy mix as well as in terms of power sector by 2025. This target is then realized by implementing a plan to build 56.4 GW additional power generation until 2028 as stated in the Electricity Supply Business Plan (RUPTL) 2019–2028. However, the deployment of RE power plant seems to be threatened due to untoward pricing policy which is significantly lower than the generation cost of RE-based electricity, resulting in the increase of possibility of future RE projects becoming unfeasible. Using 242 RE projects documented in 2019–2018 RUPTL, this study aims to examine the feasibility of future projects under BPP price and identify other factors which could possibly increase the project's viability. The scope of this study includes several technologies such as wind, solar, hydro, mini hydro, biomass, and biogas. The financial model was used to estimate the Net Present Value (NPV) of the project as a feasibility indicator. Data for project's cost structure and financial assumption is obtained by literature review, survey and focus group discussion (FGD) to RE developers. The results show that only less than 50 percent of the samples are feasible, accounting for only 43 per cent by number of projects (103 out of 242 projects) and 42 per cent by capacity (2,452 out of 5,888 MW). Hydro power becomes RE technologies with the highest feasibility followed by biomass. Projects located in Bangka Belitung, Gorontalo, East Kalimantan, Maluku, and North Sulawesi are all feasible, while those in main islands particularly Java Island are mostly unfeasible due to the lower tariff. In addition to the low feasibility rate, there are several cost components which are considered as Indonesia specific costs such as local content, land acquisition cost, transmission infrastructure cost, and regional adjustment for project location which results in higher project's costs. Finally, it is important for the government to formulate a set of incentive policies for alleviating unfeasible RE projects.

Download (PDF, 920KB)

Latest Publications

BI Board of Governors Meeting, April 2025 – Macroeconomic Analysis Series

April 23, 2025

MSME Resilience in the Face of COVID-19 and Beyond: A Meta-Analysis of Factors that Influence MSME Resilience

April 14, 2025

Monthly Inflation, April 2025 : Macroeconomic Analysis Series

April 10, 2025

Indonesia’s Employment Risks in the Shadow of US Reciprocal Tariffs – Labor Market Brief, April 2025

April 10, 2025

Related Publications

trade war

BI Board of Governors Meeting, April 2025 – Macroeconomic Analysis Series

Indonesian MSMEs

MSME Resilience in the Face of COVID-19 and Beyond: A Meta-Analysis of Factors that Influence MSME Resilience

April inflation

Monthly Inflation, April 2025 : Macroeconomic Analysis Series

Positive SSL Wildcard